Knowledge Base Wiki

Search for LIMS content across all our Wiki Knowledge Bases.

Type a search term to find related articles by LIMS subject matter experts gathered from the most trusted and dynamic collaboration tools in the laboratory informatics industry.

 103 Street
 "1" train
New York City Subway station (rapid transit)
The southbound platform of the 103rd Street station
The station's southbound platform in 2021
Station statistics
AddressWest 103rd Street & Broadway
New York, New York
BoroughManhattan
LocaleUpper West Side, Manhattan Valley
Coordinates40°47′58″N 73°58′05″W / 40.799419°N 73.968158°W / 40.799419; -73.968158
DivisionA (IRT)[1]
Line   IRT Broadway–Seventh Avenue Line
Services   1 all times (all times)
TransitBus transport NYCT Bus: M104[2]
StructureUnderground
Platforms2 side platforms
Tracks3 (2 in regular service)
Other information
OpenedOctober 27, 1904; 120 years ago (1904-10-27)[3]
Opposite-
direction
transfer
Yes
Traffic
20232,892,314[4]Increase 12.3%
Rank113 out of 423[4]
Services
Preceding station New York City Subway New York City Subway Following station
Cathedral Parkway–110th Street
Local
96th Street
Location
103rd Street station (IRT Broadway–Seventh Avenue Line) is located in New York City Subway
103rd Street station (IRT Broadway–Seventh Avenue Line)
103rd Street station (IRT Broadway–Seventh Avenue Line) is located in New York City
103rd Street station (IRT Broadway–Seventh Avenue Line)
103rd Street station (IRT Broadway–Seventh Avenue Line) is located in New York
103rd Street station (IRT Broadway–Seventh Avenue Line)
Track layout

Street map

Map

Station service legend
Symbol Description
Stops all times Stops all times

The 103rd Street station is a local station on the IRT Broadway–Seventh Avenue Line of the New York City Subway. Located at the intersection of 103rd Street and Broadway in the Upper West Side neighborhood of Manhattan, within Manhattan Valley, it is served by the 1 train at all times.

The 103rd Street station was constructed for the Interborough Rapid Transit Company (IRT) as part of the city's first subway line, which was approved in 1900. Construction of the line segment that includes 103rd Street began on August 22 of the same year. The station opened on October 27, 1904, as one of the original 28 stations of the New York City Subway. The station's platforms were lengthened in 1948, and the station was renovated in the 2000s. The 103rd Street station contains two side platforms and three tracks; the center track is not used in regular service. The station was built with tile and mosaic decorations. The mezzanine above the platforms contains exits to 103rd Street and Broadway.

History

Construction and opening

Black-and-white photo of the station's northbound platform in 1905
The northbound platform of the 103rd Street station in 1905

Planning for a subway line in New York City dates to 1864.[5]: 21  However, development of what would become the city's first subway line did not start until 1894, when the New York State Legislature passed the Rapid Transit Act.[5]: 139–140  The subway plans were drawn up by a team of engineers led by William Barclay Parsons, the Rapid Transit Commission's chief engineer. It called for a subway line from New York City Hall in lower Manhattan to the Upper West Side, where two branches would lead north into the Bronx.[6]: 3  A plan was formally adopted in 1897,[5]: 148  and all legal conflicts concerning the route alignment were resolved near the end of 1899.[5]: 161 

The Rapid Transit Construction Company, organized by John B. McDonald and funded by August Belmont Jr., signed the initial Contract 1 with the Rapid Transit Commission in February 1900,[7] under which it would construct the subway and maintain a 50-year operating lease from the opening of the line.[5]: 165  In 1901, the firm of Heins & LaFarge was hired to design the underground stations.[6]: 4  Belmont incorporated the Interborough Rapid Transit Company (IRT) in April 1902 to operate the subway.[5]: 182 

The 103rd Street station was constructed as part of the IRT's West Side Line (now the Broadway–Seventh Avenue Line). It was built along with the section of line from 82nd Street to 104th Street, for which construction began on August 22, 1900.[7] The East Side Branch (now Lenox Avenue Line) split off directly to the south. The section of the West Side Line around this station was originally planned as a two-track line, but in early 1901, was changed to a three-track structure to permit train storage in the center track.[8]: 93 [9]: 189–190  A third track was added directly north of 96th Street, immediately east of the originally planned two tracks.[10]: 14  By late 1903, the subway was nearly complete, but the IRT Powerhouse and the system's electrical substations were still under construction, delaying the system's opening.[5]: 186 [11] As late as October 26, 1904, the day before the subway was scheduled to open, the walls still had "many rough spots" according to The New York Times.[12]

The 103rd Street station opened on October 27, 1904, as one of the original 28 stations of the New York City Subway from City Hall to 145th Street on the West Side Branch.[3][5]: 186  The opening of the first subway line helped contribute to the development of Morningside Heights and Harlem.[13]: 8  The Hotel Marseilles apartment building, across the street from one of the station's exits, was built in anticipation of the 103rd Street station's opening.[14][15]

Service changes and station renovations

20th century

After the first subway line was completed in 1908,[16] the station was served by West Side local and express trains. Express trains began at South Ferry in Manhattan or Atlantic Avenue in Brooklyn, and ended at 242nd Street in the Bronx. Local trains ran from City Hall to 242nd Street during rush hours, continuing south from City Hall to South Ferry at other times.[17] In 1918, the Broadway–Seventh Avenue Line opened south of Times Square–42nd Street, and the original line was divided into an H-shaped system. The original subway north of Times Square thus became part of the Broadway–Seventh Avenue Line. Local trains were sent to South Ferry, while express trains used the new Clark Street Tunnel to Brooklyn.[18]

To address overcrowding, in 1909, the New York Public Service Commission proposed lengthening the platforms at stations along the original IRT subway.[19]: 168  As part of a modification to the IRT's construction contracts made on January 18, 1910, the company was to lengthen station platforms to accommodate ten-car express and six-car local trains. In addition to $1.5 million (equivalent to $49.1 million in 2023) spent on platform lengthening, $500,000 (equivalent to $16.4 million in 2023) was spent on building additional entrances and exits. It was anticipated that these improvements would increase capacity by 25 percent.[20]: 15 

On September 30, 1910, the New York Public Service Commission approved a modification to Contract 1 to allow for the construction of additional entrances and exits at five stations, including 103rd Street and 110th Street on Broadway. Work was expected to be completed within a year of the date that permission was granted to do the work at these two stations.[21] The northbound platform at the 103rd Street station was extended 125 feet (38 m) to the north,[20]: 111  while the southbound platform was not lengthened.[20]: 106  Six-car local trains began operating in October 1910,[19]: 168  and ten-car express trains began running on the West Side Line on January 24, 1911.[19]: 168 [22] Subsequently, the station could accommodate six-car local trains, but ten-car trains could not open some of their doors.[23]

In conjunction with the platform lengthening, a new entrance was installed at the southeast corner of 104th Street and Broadway; it was completed in March 1912. The kiosk for this entrance had previously been located at the southeast corner of Broadway and 42nd Street, serving the Times Square–42nd Street station, but it had been removed because 42nd Street was being widened.[24] In 1920, an additional exit was constructed at 103rd Street in case of emergencies.[25] In 1930, the kiosk for the entrance at the southeastern corner of 104th Street and Broadway was removed.[26]

Tiles on the walls of the platform extension. There are vertical and horizontal green mosaic bands, surrounding white ceramic bricks on the bottom and three rectangular mosaic boxes on the top. The center box contains the number "103" in white tiles on a green background. The left and right boxes contain bronze tiles.
View of tiling installed on the platform extension

The city government took over the IRT's operations on June 12, 1940.[27][28] Platforms at IRT Broadway–Seventh Avenue Line stations between 103rd Street and 238th Street were lengthened to 514 feet (157 m) between 1946 and 1948, allowing full ten-car express trains to stop at these stations.[23] A contract for the platform extensions at 103rd Street and eight other stations on the line was awarded to Spencer, White & Prentis Inc. in October 1946,[29] with an estimated cost of $3.891 million.[30] The platform extensions at these stations were opened in stages. On April 6, 1948, the platform extensionsf at 103rd Street opened.[23] Simultaneously, the IRT routes were given numbered designations with the introduction of "R-type" rolling stock, which contained rollsigns with numbered designations for each service.[31] The route to 242nd Street became known as the 1.[32] In 1959, all 1 trains became local.[33]

On October 17, 1969, the New York City Transit Authority (NYCTA) adopted a contract to replace the station's original entrance in the center mall of Broadway at 103rd Street with new entrances on the sidewalk so it could be put out for bidding. The project was intended to allow passengers to enter the station without having to cross Broadway.[34] The exit was closed and demolished after 1969.[34]

In 1979, the New York City Landmarks Preservation Commission (LPC) designated space within the boundaries of the original stations at twelve IRT stations, excluding expansions made after 1904, as a city landmark.[6][35] 103rd Street was not landmarked, unlike the 110th Street and 116th Street stations on the line. The 103rd Street station was left unprotected not because of a dearth of historic architecture, as with other structures that had been denied landmark status. Rather, its exclusion was part of a compromise between the Metropolitan Transportation Authority (MTA) and the LPC, which limited the scope of the interior-landmark designation.[36]

In April 1988,[37] the NYCTA unveiled plans to speed up service on the Broadway–Seventh Avenue Line through the implementation of a skip-stop service: the 9 train.[38] When skip-stop service started in 1989, it was only implemented north of 137th Street–City College on weekdays, and 103rd Street was served by both the 1 and the 9.[39][40][41]

21st century

View of a wide section of the northbound platform. There is a bench (with passengers sitting on it), a stair, and a wall to the right. On the left is a row of pillars with white ceramic tile pillars containing the number "103", as well as a yellow tactile strip on the platform edge. There are subway tracks to the far left.
Northbound platform
View of a narrow section of the southbound platform. There is a bench and wall to the left, as well as pillars with the number "103" to the right. There are subway tracks to the far right.
Narrower portion of the southbound platform

In June 2002, the MTA announced that ten subway stations citywide, including 103rd Street, 110th Street, 116th Street, 125th Street, and 231st Street on the IRT Broadway–Seventh Avenue Line, would receive renovations. As part of the project, fare control areas would be redesigned, flooring, and electrical and communication systems would be upgraded, and new lighting, public address systems and stairways would be installed. Historical elements at the four stations on the line in Manhattan would be replaced or restored, including their white wall tiles. At the ends of the station platforms at 103rd Street, 110th Street, and 116th Street, a small section of station wall, which would look identical to the existing station walls, would be added to provide space for scrubber rooms.[42][36] Work on the ten citywide renovation projects was estimated to cost almost $146 million, and was scheduled to start later that year, and be completed in April 2004, in time for the 100th anniversary of the station's opening, and the 250th anniversary of Columbia University.[43][44]

Columbia University agreed to contribute $1 million to the renovation of the 103rd Street station following its announcement in April that it would purchase a building adjacent to that station. As a condition of the funding allocation for the station renovation at 103rd Street, the university wanted work on the project to be expedited. Residents of Morningside Heights approved of the renovation plans, but were concerned that the expedited repairs would come at the cost of damaging the stations' historic elements. Block associations near the 103rd Street station contracted a firm to develop a plan to renovate the station quickly while maintaining its historic elements. The MTA was expected to decide whether preservation or speed would be prioritized in the station renovation projects by the end of the year.[42]

In December 2002, Manhattan Community Board 7 voted in favor of the plan to include artwork from the MTA's Arts for Transit program at the 103rd Street station, which was not landmarked. Community Board 7 voted against the plan to include new artwork at the landmarked 110th Street and 116th Street stations.[45] On February 4, 2003, Community Board 7 voted in favor of renovating the 103rd Street and 110th Street stations, but against the inclusion of any new artwork in the stations, going against the board's initial vote to support the installation of artwork at 103rd Street. The opposition to the addition of artwork at that stop stemmed from the belief among opponents of the plan for artwork that the station's historic features would be more vulnerable as the station was not landmarked.[36] From May 31 to July 12, 2003, the uptown platforms at the 116th Street and 103rd Street stations were closed at all times for their renovations.[46] Skip-stop service ended on May 27, 2005, as a result of a decrease in the number of riders who benefited.[47][48]

Station layout

Ground Street level Exit/entrance
Mezzanine Fare control, station agent, MetroCard and OMNY machines
Platform level Side platform
Northbound local "1" train toward Van Cortlandt Park–242nd Street (Cathedral Parkway–110th Street)
Peak-direction express No regular service
Southbound local "1" train toward South Ferry (96th Street)
Side platform
A mosaic name tablet on the wall of the 103rd Street station. There are white ceramic tiles surrounding a tablet with bronze, salmon, and green tiles. At the center are white mosaic tiles spelling out "103rd Street".
Mosaic name tablet
A cartouche on the wall of the 103rd Street station. There are white ceramic tiles, separated by bands of green mosaic tiles, as well as scattered sections of salmon mosaic tiles. At top center is a carved cartouche, surrounding a blue oval with the number "103" in white text.
Cartouche by Grueby

This station was part of the original subway, and has two side platforms and three tracks, the center one being an unused express track.[49] The station is served by the 1 at all times[50] and is between 110th Street to the north and 96th Street to the south.[51] The platforms were originally 350 feet (110 m) long, like at other stations north of 96th Street,[6]: 4 [52]: 8  but as a result of the 1948 platform extension, became 526 feet (160 m) long.[23][53] The platform extensions are at the southern ends of the original platforms.[52]: 39  The southbound platform is 9.25 feet (2.82 m) wide, while the northbound platform is 9.67 feet (2.95 m) wide. There is a mezzanine above the platforms, which contains the fare control area, as well as two stairs to each side of Broadway, and two stairs to both platforms. The station platforms are located on a curve.[53]

The southbound local track is known as BB1 and the northbound one is BB4; the BB designation is used for chaining purposes along the Broadway–Seventh Avenue Line from 96th Street to 242nd Street and not in everyday speech. Although it cannot be accessed at 103rd Street, the center track is designated as M.[49] South of the station, there are switches that connect the express track to either local track, with trains then being able to cross over to the rising express tracks from the IRT Lenox Avenue Line, which curve from 104th Street in the east.[49]

Design

As with other stations built as part of the original IRT, the station was constructed using a cut-and-cover method.[54]: 237  The tunnel is covered by a U-shaped trough that contains utility pipes and wires. The bottom of this trough contains a foundation of concrete no less than 4 inches (100 mm) thick.[52]: 9  Each platform consists of 3-inch-thick (7.6 cm) concrete slabs, beneath which are drainage basins. The original platforms contain circular, cast-iron Doric-style columns spaced every 15 feet (4.6 m), while the platform extensions contain I-beam columns. Additional columns between the tracks, spaced every 5 feet (1.5 m), support the jack-arched concrete station roofs.[6]: 4 [52]: 9  There is a 1-inch (25 mm) gap between the trough wall and the platform walls, which are made of 4-inch (100 mm)-thick brick covered over by a tiled finish.[52]: 9 

The decorative scheme consists of green tile tablets; green, pink, and red tile bands; a yellow faience cornice; and blue faience plaques.[52]: 39  The mosaic tiles at all original IRT stations were manufactured by the American Encaustic Tile Company, which subcontracted the installations at each station.[52]: 31  The decorative work was performed by tile contractor Alfred Boote Company and faience contractor Grueby Faience Company.[52]: 39 

Entrances and exits

Current entrances/exits

View of the rear of the exit staircase at the northwest corner of 103rd Street and Broadway. There is a sign saying "103 Street Station (1)" attached to the balustrade that surrounds the staircase. Above the sign is a video screen.
Northwestern corner stairs

The station has four entrance/exit stairs that serve both platforms. Two are on the northwest corner of Broadway and 103rd Street and two are on the northeastern corner of the same intersection. A fifth, exit-only stair leads from the northbound platform to the southeastern corner of Broadway and 104th Street.[55]

Former station house

There was a station house in the median of Broadway, just north of 103rd Street, which was designed by Heins & LaFarge and dated to the station's opening in 1904.[56] It was built as one of several station houses on the original IRT; similar station houses were built at Atlantic Avenue, Bowling Green, Mott Avenue, 72nd Street, and 116th Street.[57]: 46 [58]: 2 

The station house, which was identical to one at 116th Street, occupied an area of 50 by 20 feet (15.2 by 6.1 m). The one-story station house contained exterior walls made of buff brick, with a foundation made of granite blocks. A limestone string course ran atop the exterior wall. At the corners of the station house were limestone quoins, which supported a copper-and-terracotta gable roof facing west and east. The ridge of the station house's roof was a skylight made of glass and metal. The doorways were centrally located on the north and south walls of the station house, topped by terracotta finials and a rounded gable. There were terracotta crosses on each rounded gable with the number "103" embossed onto them. Above the doorway was a pediment and an arched window made of glass and wrought iron.[52]: 12  It was closed and demolished after 1969.[34]

References

  1. ^ "Glossary". Second Avenue Subway Supplemental Draft Environmental Impact Statement (SDEIS) (PDF). Vol. 1. Metropolitan Transportation Authority. March 4, 2003. pp. 1–2. Archived from the original (PDF) on February 26, 2021. Retrieved January 1, 2021.
  2. ^ "Manhattan Bus Map" (PDF). Metropolitan Transportation Authority. July 2019. Retrieved December 1, 2020.
  3. ^ a b "Our Subway Open: 150,000 Try It; Mayor McClellan Runs the First Official Train". The New York Times. October 28, 1904. p. 1. ISSN 0362-4331. Archived from the original on December 13, 2021. Retrieved April 21, 2020.
  4. ^ a b "Annual Subway Ridership (2018–2023)". Metropolitan Transportation Authority. 2023. Retrieved April 20, 2024.
  5. ^ a b c d e f g h Walker, James Blaine (1918). Fifty Years of Rapid Transit — 1864 to 1917. New York, N.Y.: Law Printing. Retrieved November 6, 2016.
  6. ^ a b c d e "Interborough Rapid Transit System, Underground Interior" (PDF). New York City Landmarks Preservation Commission. October 23, 1979. Archived (PDF) from the original on March 27, 2016. Retrieved November 19, 2019.
  7. ^ a b Report of the Board of Rapid Transit Railroad Commissioners for the City of New York For The Year Ending December 31, 1904 Accompanied By Reports of the Chief Engineer and of the Auditor. Board of Rapid Transit Railroad Commissioners. 1905. pp. 229–236.
  8. ^ Report of the Board of Rapid Transit Railroad Commissioners For And In The City of New York Up to December 31, 1901. Board of Rapid Transit Railroad Commissioners. 1902. Archived from the original on May 2, 2022. Retrieved December 19, 2020.
  9. ^ Report of the Public Service Commission For The First District of the State of New York For The Year Ending December 31, 1909. Albany: Public Service Commission. 1910. Archived from the original on April 22, 2022. Retrieved December 19, 2020.
  10. ^ "New York City's Subway Turns 100" (PDF). The Bulletin. 47 (10). Electric Railroaders' Association. October 2004. Archived from the original (PDF) on April 3, 2018. Retrieved April 2, 2018.
  11. ^ "First of Subway Tests; West Side Experimental Trains to be Run by Jan. 1 Broadway Tunnel Tracks Laid, Except on Three Little Sections, to 104th Street – Power House Delays". The New York Times. November 14, 1903. ISSN 0362-4331. Archived from the original on May 5, 2022. Retrieved May 10, 2022.
  12. ^ "Clamor for Tickets for Subway Opening; Distribution Plan Criticised by Engineers and Many Others". The New York Times. October 26, 1904. ISSN 0362-4331. Retrieved May 25, 2023.
  13. ^ "New York MPS 110th Street—Cathedral Parkway Subway Station (IRT)". Records of the National Park Service, 1785 – 2006, Series: National Register of Historic Places and National Historic Landmarks Program Records, 2013 – 2017, Box: National Register of Historic Places and National Historic Landmarks Program Records: New York, ID: 75313907. National Archives.
  14. ^ White, Norval; Willensky, Elliot; Leadon, Fran (2010). AIA Guide to New York City (5th ed.). New York: Oxford University Press. p. 388. ISBN 978-0-19538-386-7.
  15. ^ Hotel Marseilles (PDF) (Report). New York City Landmarks Preservation Commission. October 2, 1990. p. 3.
  16. ^ "Our First Subway Completed At Last — Opening of the Van Cortlandt Extension Finishes System Begun in 1900 — The Job Cost $60,000,000 — A Twenty-Mile Ride from Brooklyn to 242d Street for a Nickel Is Possible Now". The New York Times. August 2, 1908. p. 10. Archived from the original on December 23, 2021. Retrieved November 6, 2016.
  17. ^ Herries, William (1916). Brooklyn Daily Eagle Almanac. Brooklyn Daily Eagle. p. 119. Archived from the original on May 11, 2021. Retrieved December 19, 2020.
  18. ^ "Open New Subway Lines to Traffic; Called a Triumph" (PDF). The New York Times. August 2, 1918. p. 1. ISSN 0362-4331. Archived (PDF) from the original on December 12, 2019. Retrieved October 4, 2011.
  19. ^ a b c Hood, Clifton (1978). "The Impact of the IRT in New York City" (PDF). Historic American Engineering Record. pp. 146–207 (PDF pp. 147–208). Archived (PDF) from the original on January 17, 2021. Retrieved December 20, 2020. Public Domain This article incorporates text from this source, which is in the public domain.{{cite web}}: CS1 maint: postscript (link)
  20. ^ a b c Report of the Public Service Commission for the First District of the State of New York For The Year Ending December 31, 1910. Public Service Commission. 1911. Archived from the original on January 20, 2021. Retrieved January 7, 2021.
  21. ^ Proceedings of the Public Service Commission For The First District State of New York Volume V From January 3 to December 31, 1910 (With Index). New York State Public Service Commission. 1910. pp. 650–653. Archived from the original on April 7, 2022. Retrieved January 7, 2021.
  22. ^ "Ten-car Trains in Subway to-day; New Service Begins on Lenox Av. Line and Will Be Extended to Broadway To-morrow". The New York Times. January 23, 1911. ISSN 0362-4331. Archived from the original on April 5, 2018. Retrieved April 5, 2018.
  23. ^ a b c d Report for the three and one-half years ending June 30, 1949. New York City Board of Transportation. 1949. hdl:2027/mdp.39015023094926.
  24. ^ District, New York (State) Public Service Commission First (1913). Report of the Public Service Commission for the First District of the State of New York. The Commission. p. 163. Archived from the original on May 4, 2022. Retrieved January 7, 2021.
  25. ^ 1920–1921 Annual Report of the Interborough Rapid Transit Company For The Year Ended June 30, 1921. Interborough Rapid Transit Company. 1921. p. 10. Archived from the original on May 20, 2021. Retrieved December 21, 2020.
  26. ^ Commission, New York (State) Transit (1930). Proceedings of the Transit Commission, State of New York. p. 1260. Archived from the original on June 15, 2022. Retrieved January 7, 2021.
  27. ^ "City Transit Unity Is Now a Reality; Title to I.R.T. Lines Passes to Municipality, Ending 19-Year Campaign". The New York Times. June 13, 1940. ISSN 0362-4331. Archived from the original on January 7, 2022. Retrieved May 14, 2022.
  28. ^ "Transit Unification Completed As City Takes Over I. R. T. Lines: Systems Come Under Single Control After Efforts Begun in 1921; Mayor Is Jubilant at City Hall Ceremony Recalling 1904 Celebration". New York Herald Tribune. June 13, 1940. p. 25. ProQuest 1248134780.
  29. ^ Crowell, Paul (October 11, 1946). "Improvement Costs Voted for Subway; Board of Estimate Appropriates $31,291,000 for New Cars and Station Lengthening" (PDF). The New York Times. p. 24. ISSN 0362-4331. Archived from the original on May 21, 2022. Retrieved July 28, 2021.
  30. ^ "City Approves $35,153,000 Subway Outlay: Board of Estimate Awards Contract for 400 Cars and 10 Station Projects". New York Herald Tribune. October 11, 1946. p. 40. ISSN 1941-0646. ProQuest 1287183692.
  31. ^ Brown, Nicole (May 17, 2019). "How did the MTA subway lines get their letter or number? NYCurious". amNewYork. Archived from the original on January 30, 2022. Retrieved January 27, 2021.
  32. ^ Friedlander, Alex; Lonto, Arthur; Raudenbush, Henry (April 1960). "A Summary of Services on the IRT Division, NYCTA" (PDF). New York Division Bulletin. 3 (1). Electric Railroaders' Association: 2. Archived from the original (PDF) on September 14, 2020. Retrieved January 27, 2021.
  33. ^ "Wagner Praises Modernized IRT — Mayor and Transit Authority Are Hailed as West Side Changes Take Effect". The New York Times. February 7, 1959. p. 21. Archived from the original on January 1, 2018. Retrieved November 6, 2016.
  34. ^ a b c Minutes and Proceedings of the New York City Transit Authority. New York City Transit Authority. 1969. p. 519. Archived from the original on August 20, 2020. Retrieved January 5, 2021.
  35. ^ "12 IRT Subway Stops Get Landmark Status". The New York Times. October 27, 1979. ISSN 0362-4331. Archived from the original on March 9, 2018. Retrieved December 26, 2020.
  36. ^ a b c Homans, Charlie (February 6, 2003). "CB7 Rejects MTA's Arts For Transit Proposition". Columbia Daily Spectator. Archived from the original on June 15, 2022. Retrieved January 5, 2021.
  37. ^ Brozan, Nadine (June 4, 1989). "'Skip-Stop' Subway Plan Annoys No. 1 Riders". The New York Times. ISSN 0362-4331. Archived from the original on August 10, 2016. Retrieved June 15, 2016.
  38. ^ Moore, Keith (June 10, 1988). "TA's skip-stop plan hit". New York Daily News. Archived from the original on November 8, 2018. Retrieved November 8, 2018.
  39. ^ "#1 Riders: Your Service is Changing". New York Daily News. August 20, 1989. Archived from the original on November 8, 2018. Retrieved November 8, 2018.
  40. ^ "Announcing 1 and 9 Skip-Stop Service on the Broadway-Seventh Avenue Line" (PDF). New York City Transit Authority. August 1989. Archived from the original (PDF) on June 26, 2020. Retrieved August 1, 2009.
  41. ^ Lorch, Donatella (August 22, 1989). "New Service For Subways On West Side". The New York Times. ISSN 0362-4331. Archived from the original on August 10, 2016. Retrieved June 15, 2016.
  42. ^ a b Nowakowski, Xan (September 11, 2002). "Columbia Invests in Area Subway Stations". Columbia Daily Spectator. Archived from the original on January 8, 2021. Retrieved January 5, 2021.
  43. ^ Donohue, Pete (June 11, 2002). "Renovation Is Set For 10 Subway Stations". New York Daily News. Archived from the original on January 9, 2018. Retrieved January 8, 2018.
  44. ^ Angara, Harini (January 23, 2004). "116th Subway Station Gets a Face Lift". Columbia Spectator. Archived from the original on January 8, 2021. Retrieved January 5, 2021.
  45. ^ Homans, Charlie (January 24, 2003). "Tunnel Vision: MTA, Locals Don't See Eye to Eye". Columbia Daily Spectator. Archived from the original on January 7, 2021. Retrieved January 5, 2021.
  46. ^ "1 9 Uptown Platforms at 103 St. and 116 St. will be closed". Columbia Daily Spectator. May 28, 2003. Archived from the original on January 9, 2021. Retrieved January 5, 2021.
  47. ^ Chan, Sewell (May 25, 2005). "On Its Last Wheels, No. 9 Line Is Vanishing on Signs". The New York Times. ISSN 0362-4331. Archived from the original on March 17, 2015. Retrieved August 29, 2016.
  48. ^ "Noteworthy – 9 discontinued". May 7, 2005. Archived from the original on May 7, 2005. Retrieved September 18, 2016.
  49. ^ a b c Dougherty, Peter (2006) [2002]. Tracks of the New York City Subway 2006 (3rd ed.). Dougherty. OCLC 49777633 – via Google Books.
  50. ^ "1 Subway Timetable, Effective December 17, 2023". Metropolitan Transportation Authority. Retrieved June 28, 2024.
  51. ^ "Subway Map" (PDF). Metropolitan Transportation Authority. September 2021. Retrieved September 17, 2021.
  52. ^ a b c d e f g h i Framberger, David J. (1978). "Architectural Designs for New York's First Subway" (PDF). Historic American Engineering Record. pp. 1–46 (PDF pp. 367–412). Archived (PDF) from the original on January 17, 2021. Retrieved December 20, 2020. Public Domain This article incorporates text from this source, which is in the public domain.{{cite web}}: CS1 maint: postscript (link)
  53. ^ a b "Station ADA Accessibility Analysis 2017 103rd Street". New York City Transit. December 31, 2019. Archived from the original on July 29, 2021. Retrieved July 29, 2021.
  54. ^ Scott, Charles (1978). "Design and Construction of the IRT: Civil Engineering" (PDF). Historic American Engineering Record. pp. 208–282 (PDF pp. 209–283). Archived (PDF) from the original on January 17, 2021. Retrieved December 20, 2020. Public Domain This article incorporates text from this source, which is in the public domain.{{cite web}}: CS1 maint: postscript (link)
  55. ^ "MTA Neighborhood Maps: 103rd Street (1)". mta.info. Metropolitan Transportation Authority. April 2018. Archived from the original on August 29, 2021. Retrieved January 5, 2021.
  56. ^ "Heins & LaFarge original plans, elevations and sections for the 103rd Street IRT Station". Archived from the original on April 17, 2016. Retrieved December 21, 2020.
  57. ^ Stern, Robert A. M.; Gilmartin, Gregory; Massengale, John Montague (1983). New York 1900: Metropolitan Architecture and Urbanism, 1890–1915. New York: Rizzoli. ISBN 0-8478-0511-5. OCLC 9829395.
  58. ^ "Interborough Rapid Transit System, 72nd Street Control House" (PDF). New York City Landmarks Preservation Commission. January 9, 1979. Archived (PDF) from the original on May 11, 2021. Retrieved November 19, 2019.