Infrastructure tools to support an effective radiation oncology learning health system

B9
History
United Kingdom
NameB9
Ordered1904–1905 Naval Programme
BuilderVickers
Cost£47,000
Launched26 January 1906
Completed28 April 1906
FateSold for scrap, 1919
General characteristics
Class and typeB-class submarine
Displacement
  • 287 long tons (292 t) surfaced
  • 316 long tons (321 t) submerged
Length142 ft 3 in (43.4 m)
Beam12 ft 7 in (3.8 m)
Draught11 ft 2 in (3.4 m)
Installed power
Propulsion
Speed
  • 12 knots (22 km/h; 14 mph) (surfaced)
  • 6.5 knots (12.0 km/h; 7.5 mph) (submerged)
Range1,000 nmi (1,900 km; 1,200 mi) at 8.7 knots (16.1 km/h; 10.0 mph) on the surface
Test depth100 feet (30.5 m)
Complement2 officers and 13 ratings
Armament2 × 18 in (450 mm) bow torpedo tubes

HMS B9 was one of 11 B-class submarines built for the Royal Navy in the first decade of the 20th century. Completed in 1906, she was initially assigned to the Home Fleet, before the boat was transferred to the Mediterranean six years later. After the First World War began in 1914, B9 played a minor role in the Dardanelles Campaign. The boat was transferred to the Adriatic Sea in 1916 to support Italian forces against the Austro-Hungarian Navy. She was converted into a patrol boat in 1917 and was sold for scrap in 1919.

Design and description

The B class was an enlarged and improved version of the preceding A class. The submarines had a length of 142 feet 3 inches (43.4 m) overall, a beam of 12 feet 7 inches (3.8 m) and a mean draft of 11 feet 2 inches (3.4 m). They displaced 287 long tons (292 t) on the surface and 316 long tons (321 t) submerged. The boats could dive to a depth of 100 feet (30.5 m). The B-class submarines had a crew of two officers and thirteen ratings.[1]

For surface running, the boats were powered by a single 16-cylinder 600-brake-horsepower (447 kW) Vickers petrol engine that drove one propeller shaft. When submerged the propeller was driven by a 180-horsepower (134 kW) electric motor. They could reach 12 knots (22 km/h; 14 mph) on the surface and 6.5 knots (12.0 km/h; 7.5 mph) underwater.[1] On the surface, the B class had a range of 1,000 nautical miles (1,900 km; 1,200 mi) at 8.7 knots (16.1 km/h; 10.0 mph).[2]

The boats were armed with two 18-inch (450 mm) torpedo tubes in the bow. They could carry a pair of reload torpedoes, but generally did not as they would have to remove an equal weight of fuel in compensation.[3]

Construction and career

Ordered as part of the 1904–1905 Naval Programme, B9 was built by Vickers at their Barrow-in-Furness shipyard. She was launched on 26 January 1906 and completed on 28 April at a cost of £47,000. The B-class submarines were initially assigned to the Third Division of the Home Fleet, based at Portsmouth and Devonport, and were tasked with coastal-defence duties and defending the Straits of Dover in wartime. In 1912, HMS B9, HMS B10 and HMS B11 were transferred to Malta.[4]

After the start of the First World War and the unsuccessful pursuit of the German ships Goeben and Breslau in August 1914, the B-class submarines were transferred to the Dardanelles area in mid-September to prevent any breakout attempt by the German ships. After the arrival of the larger and more modern E-class submarines in early 1915, the B-class boats began to return to Malta. After the Kingdom of Italy joined the Allies in May 1915, the B-class submarines in the Mediterranean were transferred to Venice to reinforce Italian forces in the northern Adriatic.[5] B9, B7 and B8 were the first to arrive in Venice on 11 October and B9 made their first patrol a week later. She saw no targets and returned to Venice three days later. The five British submarines made a total of 13 patrols off the Austro-Hungarian coast before the end of 1915, hampered by bad weather and drifting mines, followed by 13 more in the first two months of 1916.[6]

While on a patrol off the entrance to Pola on 29 March, B9 was spotted and unsuccessfully attacked by a pair of Lohner L flying boats. After diving the boat had great difficulty maintaining her proper depth of 60 feet (18.3 m) and three times descended below 100 feet (30.5 m) before her batteries were exhausted. The following month, the boat began a refit at Venice that lasted for several months. On 18–20 October, B9 made the last patrol, an uneventful one, by a B-class submarine in the Adriatic off the coast of Istria. Replaced by more modern H-class submarines, the B-class boats returned to Malta on 9 November to be converted into surface patrol boats, armed with a 12-pounder (3 in (76 mm)) gun. Redesignated as S9 in August 1917, the boat was assigned to patrol the Otranto Barrage that was intended to prevent the Austro-Hungarian Navy from breaking out of the Adriatic, although she proved to be very unreliable in service. Paid off at Malta, she was sold for scrap in 1919.[7]

Notes

  1. ^ a b Gardiner & Gray, p. 87
  2. ^ Akermann, p. 123
  3. ^ Harrison, Chapter 27
  4. ^ Akermann, pp. 123–125
  5. ^ Wilson, pp. 75–77
  6. ^ Kemp & Jung, pp. 14–15, 18
  7. ^ Akkerman, p. 125; Kemp & Jung, pp. 18–19, 25; Wilson, p. 79

References

  • Akermann, Paul (2002). Encyclopaedia of British Submarines 1901–1955 (reprint of the 1989 ed.). Penzance, Cornwall: Periscope Publishing. ISBN 1-904381-05-7.
  • Gardiner, Robert & Gray, Randal, eds. (1985). Conway's All the World's Fighting Ships 1906–1921. Annapolis, Maryland: Naval Institute Press. ISBN 0-85177-245-5.
  • Harrison, A. N. (January 1979). "The Development of HM Submarines From Holland No. 1 (1901) to Porpoise (1930) (BR3043)". United Kingdom Ministry of Defence. Retrieved 16 September 2019 – via RN Subs.
  • Kemp, Paul & Jung, Peter (1989). "Five Broken Down B Boats: British Submarine Operations in the Northern Adriatic 1915–1917". Warship International. XXVI (1): 10–29. ISSN 0043-0374.
  • Wilson, Michael (1981). "The British 'B' Class Submarine". In Roberts, John (ed.). Warship Volume V. London: Conway Maritime Press. pp. 38–44, 74–79. ISBN 0-85177-244-7.